LEED® certification is based on a
point system. The amount of points achieved will determine which
level of LEED® certification the project is awarded.
USGBC organizes the available
points for LEED® certification into five broad categories. Below
is a list of the categories and examples of required and
possible points for each of the categories. USGBC also provides
an optional sixth category for innovation and design process.
|
Sustainable Sites
(14 Possible Points)
|
|
Prereq 1
|
Construction Activity
Pollution Prevention
|
Required
|
|
Credit 1
|
Site Selection
|
1
|
|
Credit 2
|
Development Density &
Community Connectivity
|
1
|
|
Credit 3
|
Brownfield Redevelopment
|
1
|
|
Credit 4.1
|
Alternative Transportation,
Public Transportation Access
|
1
|
|
Credit 4.2
|
Alternative Transportation,
Bicycle Storage & Changing Rooms
|
1
|
|
Credit 4.3
|
Alternative Transportation,
Low Emitting & Fuel Efficient Vehicles
|
1
|
|
Credit 4.4
|
Alternative Transportation,
Parking Capacity
|
1
|
|
Credit 5.1
|
Site Development, Protect
or Restore Habitat
|
1
|
|
Credit 5.2
|
Site Development, Maximize
Open Space
|
1
|
|
Credit 6.1
|
Stormwater Design, Quantity
Control
|
1
|
|
Credit 6.2
|
Stormwater Design, Quality
Control
|
1
|
|
Credit 7.1
|
Heat Island Effect,
Non-Roof
|
1
|
|
Credit 7.2
|
Heat Island Effect, Roof
|
1
|
|
Credit 8
|
Light Pollution
Reduction
|
1
|
|
|
|
|
|
Water Efficiency (5
Possible Points)
|
|
Credit 1.1
|
Water Efficient
Landscaping, Reduce by 50%
|
1
|
|
Credit 1.2
|
Water Efficient
Landscaping, No Potable Use or No Irrigation
|
1
|
|
Credit 2
|
Innovative Wastewater
Technologies
|
1
|
|
Credit 3.1
|
Water Use Reduction, 20%
Reduction
|
1
|
|
Credit 3.2
|
Water Use Reduction, 30%
Reduction
|
1
|
|
|
|
|
|
Energy & Atmosphere
(17 Possible Points)
|
|
Prereq 1
|
Fundamental
Commissioning of the Building Energy Systems
|
Required
|
|
Prereq 2
|
Minimum Energy
Performance Required
|
Required
|
|
Prereq 3
|
Fundamental Refrigerant
Management Required
|
Required
|
|
Credit 1
|
Optimize Energy
Performance
|
1-10
|
|
Credit 2
|
On-Site Renewable Energy
|
1-3
|
|
Credit 3
|
Enhanced
Commissioning
|
1
|
|
Credit 4
|
Enhanced Refrigerant
Management
|
1
|
|
Credit 5
|
Measurement &
Verification
|
1
|
|
Credit 6
|
Green Power
|
1
|
|
|
|
|
|
Materials &
Resources (13 Possible Points)
|
|
Prereq 1
|
Storage & Collection of
Recyclables
|
Required
|
|
Credit 1.1
|
Building Reuse, Maintain
75% of Existing Walls, Floors & Roof
|
1
|
|
Credit 1.2
|
Building Reuse, Maintain
95% of Existing Walls, Floors & Roof
|
1
|
|
Credit 1.3
|
Building Reuse, Maintain
50% of Interior Non-Structural Elements
|
1
|
|
Credit 2.1
|
Construction Waste
Management, Divert 50% from Disposal
|
1
|
|
Credit 2.2
|
Construction Waste
Management, Divert 75% from Disposal
|
1
|
|
Credit 3.1
|
Materials Reuse, 5%
|
1
|
|
Credit 3.2
|
Materials Reuse, 10%
|
1
|
|
Credit 4.1
|
Recycled Content, 10%
(post-consumer + 1/2 pre-consumer)
|
1
|
|
Credit 4.2
|
Recycled Content, 20%
(post-consumer + 1/2 pre-consumer)
|
1
|
|
Credit 5.1
|
Regional Materials, 10%
Extracted, Processed & Manufactured Regionally
|
1
|
|
Credit 5.2
|
Regional Materials, 20%
Extracted, Processed & Manufactured Regionally
|
1
|
|
Credit 6
|
Rapidly Renewable Materials
|
1
|
|
Credit 7
|
Certified Wood
|
1
|
|
|
|
|
|
Indoor Environmental
Quality (15 Possible Points)
|
|
Prereq 1
|
Minimum IAQ Performance
|
Required
|
|
Prereq 2
|
Environmental Tobacco Smoke
(ETS) Control
|
Required
|
|
Credit 1
|
Outdoor Air Delivery
Monitoring
|
1
|
|
Credit 2
|
Increased Ventilation
|
1
|
|
Credit 3.1
|
Construction IAQ Management
Plan, During Construction
|
1
|
|
Credit 3.2
|
Construction IAQ Management
Plan, Before Occupancy
|
1
|
|
Credit 4.1
|
Low-Emitting Materials,
Adhesives & Sealants
|
1
|
|
Credit 4.2
|
Low-Emitting Materials,
Paints & Coatings
|
1
|
|
Credit 4.3
|
Low-Emitting Materials,
Carpet Systems
|
1
|
|
Credit 4.4
|
Low-Emitting Materials,
Composite Wood & Agrifiber Products
|
1
|
|
Credit 5
|
Indoor Chemical & Pollutant
Source Control
|
1
|
|
Credit 6.1
|
Controllability of
Systems, Lighting
|
1
|
|
Credit 6.2
|
Controllability of
Systems, Thermal Comfort
|
1
|
|
Credit 7.1
|
Thermal Comfort,
Design
|
1
|
|
Credit 7.2
|
Thermal Comfort,
Verification
|
1
|
|
Credit 8.1
|
Daylight & Views, Daylight
75% of Spaces
|
1
|
|
Credit 8.2
|
Daylight & Views, Views for
90% of Spaces
|
1
|
|
|
|
|
|
Innovation & Design
Process (5 Possible Points)
|
|
Credit 1.1
|
Innovation in
Design
|
1
|
|
Credit 1.2
|
Innovation in
Design
|
1
|
|
Credit 1.3
|
Innovation in
Design
|
1
|
|
Credit 1.4
|
Innovation in
Design
|
1
|
|
Credit 2
|
LEED Accredited
Professional
|
1
|